Lee Rd, Beacon Hill
Moverly Rd, South Coogee
Sloane St, Summer Hill
Intersection of Fitzgerald Ave & Malabar Rd, Maroubra
Fitzgerald Ave - Maroubra
-
Lee Rd, Beacon Hill
Client: Northern Beaches Council
Kerb & Gutter, Footpath & Coloured Pram Ramps works conducted on behalf of the Northern Beaches Council in order to provide safe walking passage for local pedestrians.
- Scope of Works:
- Coloured Pram Ramps
- Minor Asphalt works
- Minor Turf works
- Kerb & Gutter works
- 100+ lineal metres of footpath
-
Moverly Rd, South Coogee
Client: Randwick City Council
Deep-Lift road reconstruction works conducted on behalf of Randwick City Council designed to transform the suburban road into a smooth and safe pavement for motorists.
- Scope of Works:
- Demolition & excavation of approx. 4000m2 of concrete road
- Laying of heavy duty AC20 base layer
- Laying of wearing course
-
Sloane St, Summer Hill
Client: Ashfield City Council
Major drainage works conducted on behalf of Inner West Council in the heart of Summer Hill, adjacent to Summer Hill Train Station, in order to alleviate longstanding flooding issues on Sloane St & Parramatta Rd.
- Scope of Works:
- 300+ lineal metres of Reinforced Concrete Pipes Laid between Parramatta Rd & Grosvenor Crescent
- More than a dozen drainage pits constructed
- Approx. half a kilometre of Concrete Kerb & Gutter constructed
- Approx. half a kilometre of reconstructed footpath
- Asphalt re-sheeting
- Landscaping
-
Intersection of Fitzgerald Ave & Malabar Rd, Maroubra
Client: Randwick City Council
Intersection upgrade adjacent to Maroubra Beach designed to mitigate flooding issues and to rehabilitate the deteriorating concrete road.
- Scope of Works:
- Deep-Lift of existing road involving the demolition & excavation of approx. 1000M2 of concrete road over 2 nights
- Laying of heavy duty AC20 base layer
- Line marking
- Service Adjustments
- Approx. 1000m2 of wearing course
-
Fitzgerald Ave - Maroubra
Client: Randwick City Council
High-Strength, steel reinforced concrete road rectification works conducted on an arterial road to ensure a safer and smoother travel for motorists heading to Maroubra Beach and surrounding suburbs.
- Scope of Works:
- Approx. 2000m2 of concrete road slab reconstructed from Bunnerong Rd to Marine Parade